Co-operative Food - Hackney

Eco-Lux solutions were brought in to complete a new install on this acquisition of some old offices to be turned into a co-operative food store. We worked alongside our client who created the design for this job ensuring that it was installed to the highest level and completed inline with the builders program of works.

 

On our first fix here we installed unistrut hangers whereby metal tray work ran throughout the shop floor and back of house to provide containment for all power and networking cables. We installed distribution boards, with all new steell wire armored feeds for all the cases on the shop floor. An RDM monotring network was installed to monitor the correct functioning of the cases, cold rooms, pack and condensing unit. A freezer cold room and a chiller cold room were fit, where we installed the RDM control panels and all containment and wiring in conjunction with the co-op’s design specification. New Air conditioning units were installed along with the indoor cassettes and all control/power wiring.

 

This was another smoothly run project finished on time, to high standard not a single snag picked up by the consultants.

© 2017 Eco-Lux Solutions | Arran Illingworth

bottom of page